Excavating and making a foundation for a test building

This material is based upon work supported by the National Science Foundation under Grant No. 1660075 ("Topological interlocking manufactured concrete block").  Any opinions, findings, and conclusions or recommendations expressed in this material are those of the author, and do not necessarily reflect the views of the National Science Foundation.

My company was awarded a Phase II funded project by the National Science Foundation.  The main objective of this work was to demonstrate our innovative masonry systems, and to obtain a positive evaluation report from the International Code Council- Evaluation Services. In order to achieve this, it was strongly suggested by ICC-ES that we work with a Registered Design Professional architect and a licensed Professional Engineer to design and build a test or sample building for the purposes of evaluation.

We began with the building design, in consultation with Robert Ferry, RDP, AIA and Cheng-Ning Jong, PE. The basic approach was to keep the entire structure under compression, being squeezed together, which is how masonry is strongest.  We incorporated several different types of arches, domes and half-domes, configured with flying buttresses.







Work began with excavation for the footer.  This work was done room by room, in sequence, simply so we had a place to put all the excavated dirt while we worked.



The footer had its reinforcement rebar detailed by the PE. All footer sections used formwork to establish dimensions. Rebar laid flat, horizontally, was tied to the vertical rebar which would go up into the walls.  This was done using ninety-degree elbows of rebar. All rebar was “Gatorbar” basalt-based Fiber Reinforced Polymer rebar, which is lightweight, stronger than steel in tension, and never rusts.  This rebar also bends easily to provide curves for arched roofs.



Once the footer was poured, stem walls were built to make the foundation come up to grade, where the vertical walls began, above grade.






After the stem walls were built, the floor was filled back in with the excavated earth and compacted to a solid mass.






My next blog entry will talk about the next steps in construction.

1 comment:

  1. Thank for sharing the blog. Your post is very nice and informative. Loose Brick is a leading masonry contractor in Bronx, Brooklyn, and Queens. we provide a wide range of masonry and brickwork services. Visit our website for additional details.

    Masonry contractor Bronx

    Commercial Contractor Queens

    Commercial contractor bronx

    ReplyDelete