Building a Ceramic Art Studio

We decided to begin building a ceramic art studio here at Spherical Block, LLC in Alfred, NY. This facility would be modestly sized, and made of concrete block masonry construction. We decided to utilize and showcase Spherical Block’s technology by making the roof from three domes.

First we decided on a design, which was to be a central square room, flanked on either side by smaller square alcove rooms. The central dome would be a 16 ft diameter dome, and the alcoves would be covered by smaller, 8 ft diameter domes. All vertical walls would be 8 ft high. This would provide the building with an open, airy space and create a natural, flowing symmetry. Here is an early sketch of the building, which was used on the building permit application.

Having a design in hand, we obtained a building permit and began site preparation. The first step was to excavate a trough large enough to pour the footer with concrete. In our area of NY, winters can get brutally cold. This necessitates a deep footer, 4 ft. below the surface to prevent heaving from deep freezes. We hired an excellent local contractor, John Halsey, he excavated the entire footer in around half a day’s work. Here are some pictures of the formwork for the footer being assembled in the excavated trough.  The form had rebar placed in it and was filled with concrete.

A ‘stem wall’ was built on top of the footer, bringing the foundation up to the level of the ground. This stem wall was reinforced with vertical rebar placed in the core hole of blocks and poured (grouted) in place. The rebar we used was FRP basaltic rebar (Fiber Reinforced Plastic). We used #3 rebar, 3/8 inch diameter. It is lightweight, flexible, non-metallic so it never rusts, and is 3.5 times stronger than steel in tension. Basaltic rebar is especially corrosive resistant (better than fiberglass rebar). Reinforcement was located at all corners, and at 4 ft horizontal spacing along the wall lengths. Additionally, horizontal reinforcement was included as ‘ladder’ wire enforcement in the horizontal mortar beds of the stem wall.

The mortar joints are sloppy on the stem wall: they are underground and not seen. We then filled the gaps of the excavated area to provide a level surface around the stem wall. I should note that I am not a mason, nor a contractor. I experiment with novel masonry systems.

The vertical walls were then begun. I built this all by myself; lots of work, mixing mortar and moving block alone.

Next, we levelled the dirt floor and installed a rigid foam (expanded polystyrene) so that we could install a radiant heated floor system. ‘Pex’ plastic piping was arranged in the rigid foam floor, and a concrete floor was poured on top of it. Two loops of pipe were installed for the radiant heating floor system.

The vertical walls were assembled, and lintels were poured over the six windows and the door. FRP rebar was used in all lintels.

Once all lintels were cast, the windows were installed. We used double-hung, quality insulated windows.

In order to fit round domes on top of square rooms, we cast 8-inch thick reinforced pendentives. We needed pendentives for both the 8-ft alcove rooms and the 16 ft central rooms. The larger pendentive is not poured yet.

Once the pendentives were poured, we assembled the smaller 8 ft domes on top of them. Both domes were assembled fairly quickly, in just a few hours. I was working alone, tending myself and moving all block. These are assembled as a truncated icosahedron, made from pentagons and hexagons, like a soccer ball: where the white patches are hexagons and the black patches are pentagons.

 

On the inside of the building, we assembled arches as entryways into the two alcove rooms. This creates an open, elegant interior space. The areas above the masonry arches were poured with concrete.

We had a custom arched door made, and installed a masonry arch over the top. It contributes to the ‘arched’ look and feel of the whole building.

This is the building in its current state, at the end of November 2026. With cold weather rapidly approaching, it looks like we’re done for the season. Construction will resume in the Spring. It’s been a fun project so far! We are eager to make ceramic art here next year.