Wednesday, January 19, 2022

Finishing a masonry closet

I've just finished a closet in a masonry building I'm making. A closet allows me to try certain steps, before committing such steps to the entire building.  

How will the drywall work? Test it in the closet.

How will the paint look? Try the closet.  







It's a pretty cool closet. A right triangle floor, with a half-dome ceiling.













Monday, January 17, 2022

Snow covered masonry buildings

 I awoke to a beautiful 15 inches of fresh powder.  I took a few pictures of these masonry buildings covered in snow.  The domes, arches, catenary forms: all seem to create interesting topological snow surfaces.   

Sometimes people will ask about how appropriate a masonry roof is for big snow loads?  They only get stronger with more weight, and the snow also helps insulate even more.  These buildings can handle extreme snow loads.

View out my bedroom window.










Friday, September 3, 2021

Floor, walls and bond beam

 This material is based upon work supported by the National Science Foundation under Grant No. 1660075 ("Topological interlocking manufactured concrete block").  Any opinions, findings, and conclusions or recommendations expressed in this material are those of the author, and do not necessarily reflect the views of the National Science Foundation.

The previous post showed how we excavated, poured the footer and built the stem wall.  Following this, the vertical walls were assembled and the floor was installed. The floors are made to accommodate a radiant heating system. First a rigid foam is laid down, on the level compacted ground floor; then "Pex" TM pipe was installed.  


Concrete was then poured on top of the foam and pex, and screeded level, then the floor surface was floated. 





The walls were built up to header height, then a temporary scaffolding was built for roof assembly.  All exterior doorways had a masonry arch built over them, using wooden forms. The arches are fast and easy to assemble, they are also inexpensive.




After all the vertical walls were assembled, forms were built at the top of these walls; rebar was placed in this cavity as per the PE specification, and the form was poured with concrete to create a reinforced bond beam. 






With the bond beam made, roof construction was about to begin.  That's what I'll describe and show next..

Wednesday, September 1, 2021

Excavating and making a foundation for a test building

This material is based upon work supported by the National Science Foundation under Grant No. 1660075 ("Topological interlocking manufactured concrete block").  Any opinions, findings, and conclusions or recommendations expressed in this material are those of the author, and do not necessarily reflect the views of the National Science Foundation.

My company was awarded a Phase II funded project by the National Science Foundation.  The main objective of this work was to demonstrate our innovative masonry systems, and to obtain a positive evaluation report from the International Code Council- Evaluation Services. In order to achieve this, it was strongly suggested by ICC-ES that we work with a Registered Design Professional architect and a licensed Professional Engineer to design and build a test or sample building for the purposes of evaluation.

We began with the building design, in consultation with Robert Ferry, RDP, AIA and Cheng-Ning Jong, PE. The basic approach was to keep the entire structure under compression, being squeezed together, which is how masonry is strongest.  We incorporated several different types of arches, domes and half-domes, configured with flying buttresses.







Work began with excavation for the footer.  This work was done room by room, in sequence, simply so we had a place to put all the excavated dirt while we worked.



The footer had its reinforcement rebar detailed by the PE. All footer sections used formwork to establish dimensions. Rebar laid flat, horizontally, was tied to the vertical rebar which would go up into the walls.  This was done using ninety-degree elbows of rebar. All rebar was “Gatorbar” basalt-based Fiber Reinforced Polymer rebar, which is lightweight, stronger than steel in tension, and never rusts.  This rebar also bends easily to provide curves for arched roofs.



Once the footer was poured, stem walls were built to make the foundation come up to grade, where the vertical walls began, above grade.






After the stem walls were built, the floor was filled back in with the excavated earth and compacted to a solid mass.






My next blog entry will talk about the next steps in construction.

Wednesday, December 2, 2020

Product Listing by the International Code Council- Evaluation Services

 Today (December 2nd 2020) my company Spherical Block LLC received a Product Listing from the International Code Council-Evaluation Services (ICC-ES).  This puts my company's technology in accordance with the International Building Code (IBC) which is written by ICC.  This was a long, tedious, difficult and expensive process, but it's necessary for any new construction technology. 



So hooray!  It's a big step that I am glad to have accomplished and behind me.

Here are two pages from the listing itself: 






So there it is, another important step in commercialization of an idea completed. ICC-ES Product Listing.

This material is based upon work supported by the National Science Foundation under Grant No. 1660075 ("Topological interlocking manufactured concrete block").  Any opinions, findings, and conclusions or recommendations expressed in this material are those of the author, and do not necessarily reflect the views of the National Science Foundation.