I've just finished a closet in a masonry building I'm making. A closet allows me to try certain steps, before committing such steps to the entire building.
How will the drywall work? Test it in the closet.
How will the paint look? Try the closet.
I've just finished a closet in a masonry building I'm making. A closet allows me to try certain steps, before committing such steps to the entire building.
How will the drywall work? Test it in the closet.
How will the paint look? Try the closet.
This material is based upon work supported by the National Science Foundation under Grant No. 1660075 ("Topological interlocking manufactured concrete block"). Any opinions, findings, and conclusions or recommendations expressed in this material are those of the author, and do not necessarily reflect the views of the National Science Foundation.
The previous post showed how we excavated, poured the footer and built the stem wall. Following this, the vertical walls were assembled and the floor was installed. The floors are made to accommodate a radiant heating system. First a rigid foam is laid down, on the level compacted ground floor; then "Pex" TM pipe was installed.
Concrete was then poured on top of the foam and pex, and screeded level, then the floor surface was floated.
After all the vertical walls were assembled, forms were built at the top of these walls; rebar was placed in this cavity as per the PE specification, and the form was poured with concrete to create a reinforced bond beam.
Today my company Spherical Block, LLC was issued an Evaluation Report (ESR-3992) by the International Code Council-Evaluation Services (ICC-ES). This puts our masonry technology in accordance with the International Building Code and the Residential Building Code.
Today (December 2nd 2020) my company Spherical Block LLC received a Product Listing from the International Code Council-Evaluation Services (ICC-ES). This puts my company's technology in accordance with the International Building Code (IBC) which is written by ICC. This was a long, tedious, difficult and expensive process, but it's necessary for any new construction technology.